Start with the project requirements
Share the project use, installation location and fire separation requirements from the design specification. Use Class A and Class C as catalogue entry points, then confirm suitability against the project requirements and test documentation covering the selected configuration.
Review the glass and frame together
Single, double, side and compact side glazing are different configuration options. Check the glass build-up, frame section, connections and associated materials. Glass thickness or a profile name alone does not establish the fire performance of the partition assembly.
Compare quotations on the same specification
Request quotations against the same panel layout, glazing specification, finish requirements and supply scope. Review drawings, the scope of the test documentation and installation conditions alongside the price per metre of profile.
Compare drawings, not assumed performance
The supplied Class A double-glazing drawing shows a 50 × 115 mm frame with 25 mm composite glass and 6 mm tempered glass. The Class C double-glazing drawing shows 50 × 98 mm with two 6 mm tempered panes. These figures describe the drawn configurations; they do not establish the fire performance of either complete partition. Review test documentation for the assembly specified for your project.